ClimateControlSchedule Class is obsolete
Posted: 09 Mar 2015 13:04
I see that in z-way developer manual ClimateControlSchedule Class is marked as obsolete. (for ex. Danfoss LC-13 supports it).
What does it mean obsolete? (may be it's not used in new SDKs).
Or should schedules be realized only on controller side?
What does it mean obsolete? (may be it's not used in new SDKs).
Or should schedules be realized only on controller side?