Unable to include Fibaro double relay switch FGS221 v2.1 - v2.3 (2x1.5kW)

Discussions about existing Z-Wave device and their usage with Z-Way/Z-Cloud/Z-Box
Post Reply
ollie
Posts: 13
Joined: 21 May 2013 01:15

Unable to include Fibaro double relay switch FGS221 v2.1 - v2.3 (2x1.5kW)

Post by ollie »

I am stuck !

After using the (re-)include button on Z-way, I am pushing 3 times the B button... But nothing happen on the Z-Way side. Then timeout !

Any idea how to proceed ?

-------
I am running Z-way and not Z-cloud as I am planning to use the Razberry for an old house renovation project without internet access. It has to run local !
pz1
Posts: 2053
Joined: 08 Apr 2012 13:44

Try exclude first

Post by pz1 »

Have you also tried to exclude first before doing an include? That seems to work sometimes.
Since 29-12-2016 I am no longer a moderator for this forum
ollie
Posts: 13
Joined: 21 May 2013 01:15

Unfortunatly "Exclude" won't do it !

Post by ollie »

Thanks for your answer

I tried exclude as well... but no answer from the Razberry !

How could I check that the Fibaro switch is still ok ?

I am running Z-way v1.3...

Just in case the log generated !
[2013-06-09 22:45:28.708] Adding job: Add/re-include node to network
[2013-06-09 22:45:28.713] SENDING (cb 0x47): ( 01 05 00 4A 41 47 B6 )
[2013-06-09 22:45:28.724] RECEIVED ACK
[2013-06-09 22:45:28.734] RECEIVED: ( 01 07 00 4A 47 01 00 00 F4 )
[2013-06-09 22:45:28.735] SENT ACK
[2013-06-09 22:45:28.735] SETDATA controller.data.lastIncludedDevice = Empty
[2013-06-09 22:45:28.735] SETDATA controller.data.lastExcludedDevice = Empty
[2013-06-09 22:45:28.735] Job 0x4a (Add/re-include node to network): Ready to add - push button on the device to be added
[2013-06-09 22:45:28.736] SETDATA controller.data.controllerState = 1 (0x00000001)
[2013-06-09 22:45:47.623] Job 0x4a (Add/re-include node to network): Job not removed before timeout (awaiting for more callbacks?)
[2013-06-09 22:45:47.623] Job 0x4a (Add/re-include node to network): Cancelling
[2013-06-09 22:45:47.624] Job 0x4a (Add/re-include node to network): fail
[2013-06-09 22:45:47.624] Adding job: Add/re-include node to network
[2013-06-09 22:45:47.635] SENDING (cb 0xc5): ( 01 04 00 4A C5 74 )
[2013-06-09 22:45:47.646] RECEIVED ACK
[2013-06-09 22:45:47.646] Removing job: Add/re-include node to network
[2013-06-09 22:45:47.691] RECEIVED: ( 01 07 00 4A 47 06 00 00 F3 )
[2013-06-09 22:45:47.691] SENT ACK
[2013-06-09 22:45:47.692] Job 0x4a (Add/re-include node to network): Done
[2013-06-09 22:45:47.692] SETDATA controller.data.controllerState = 0 (0x00000000)
[2013-06-09 22:45:47.692] Removing job: Add/re-include node to network
[2013-06-09 22:46:06.542] Job 0x4a: deleted from queue
[2013-06-09 22:46:06.577] Job 0x4a: deleted from queue
Post Reply